Data-Driven Construction PM

BIM_4D

Data Driven Construction PM
Total control of the project through the VCM-BIM (Virtual Construction Model), Model Based Scheduling, including temporary site conditions, equipment, material, storage areas, access to the site, and adjacent conditions that create project planning constraints for both static and dynamic conditions. Earn Value analysis, and control of the project according the site circumstances and labor performance. What-If scenarios and simulations. Gobernación de Bocas del Toro, PNUD-MINGOB, Panamá. En construcción. Año 2021

Share