Energy evaluation – heritage building
Energy evaluation in a heritage building We use Thermal Blocks in the building energy model, in order to obtain the radiation analysis. Project: Convento de Santo Domingo for A3 Arquitectos.
Energy evaluation in a heritage building We use Thermal Blocks in the building energy model, in order to obtain the radiation analysis. Project: Convento de Santo Domingo for A3 Arquitectos.
Asset Information Model and renovation, heritage building. Before the intervention, and using point clouds, we made a detailed survey of the existing structures, then we made the Asset Information Model (AIM), considering all the information required in each of the components, to be used reliably in the restoration of the building. Project: Casa Antigua – … Read more
Data Driven Construction PM Total control of the project through the VCM-BIM (Virtual Construction Model), Model Based Scheduling, including temporary site conditions, equipment, material, storage areas, access to the site, and adjacent conditions that create project planning constraints for both static and dynamic conditions. Earn Value analysis, and control of the project according the site … Read more